Crisis Management Centers

KGHM Polish Copper

Location

Polkowice, ZG Polkowice-Sieroszowice

Date

April 2017

Scope

Design and installation of the V-WALL OVERLAY 92 touch pad

The task of Videofonika in the project for KGHM was the adaptation of the touch pad to the existing video wall consisting of 4 46 „seamless monitors in a 2×2 configuration. We have designed special mounting brackets, which were adapted to the existing substructure and enabled the installation of a 92 „touch pad. The whole system is used in crisis situations in the mine, helping with rescue operations.